Oz
4. The System that Keeps Projects Alive
“The cost estimates are baseless,” the engineer said, his voice low, controlled. This was an engineering program. The numbers should have been grounded in something—benchmarks, prior builds, real installations. “They’re not,” he said. “Look at the totals.” I did. “They’ve been made to fit the budget. Not